Los bericht bekijken
Oud 14 juli 2017, 21:08   #30
Micele
Secretaris-Generaal VN
 
Micele's schermafbeelding
 
Geregistreerd: 18 mei 2005
Locatie: Limburg
Berichten: 50.228
Standaard Eerste 2 350kW laadpalen staan in Berlijn

Porsche heeft de eerste twee 350 kW laadpalen in Berlijn neergezet.

Een zware E-wagen (Mission E heeft 95 kWh) opladen in ~15-20 minuten (tot 80%) is nu feit, hier de foto's:

Citaat:
https://electrek.co/2017/07/14/porsc...rging-station/



Porsche installs first ultra-fast 350 kW EV charging station

Fred Lambert - Jul. 14th 2017

Well, Porsche wasn’t kidding about jumping directly to a 350 kW charging infrastructure for its first all-electric vehicle, the upcoming Mission E.

While the vehicle is not expected until 2019, the German automaker opened new offices in Berlin today and with it, they decided to deploy their first two 350 kW chargers.

Porsche describes its new location in Berlin-Adlershof as “one of the world’s most modern Porsche centers”.

It features “state-of-the-art maintenance and repair facilities” and even a 25-meter high “solar pylon” that generates electricity, but even more interestingly, Porsches says that it is the first Porsche center “geared to the requirements of future electric vehicles” because it features the new charging station.

The station has 2 standard level 2 chargers (left picture below) and 2 of the new Porsche-developed 800-volt DC fast-charging points (right picture below) that the company claims can deliver up to 350 kW.
De stroom is dan max 437,5 A (x 800 V = 350 kW)
Citaat:
http://www.goingelectric.de/2017/07/...ark-in-berlin/

Porsche präsentiert Schnellladepark in Berlin
Veröffentlicht am 14. Juli 2017

__________________
De vuile waarheid over ICE (vanaf 1 min 35")
https://www.youtube.com/watch?v=mk-LnUYEXuM
Nederlandse versie: https://www.youtube.com/watch?v=kekJgcSdN38

Laatst gewijzigd door Micele : 14 juli 2017 om 21:30.
Micele is offline   Met citaat antwoorden